Three things decide whether a bathroom serves you for decades: the layout (fixture placement and clearances), the waterproofing (what happens behind the tile), and the ventilation. Everything else — tile, vanity, fittings, lighting — is style applied on top of those three.
The first question, before any layout is drawn, is whether the plumbing moves. It is the largest single cost variable, and the answer depends on whether the house sits on pier-and-beam or on a slab.
Real projects across Dallas and the Park Cities.






Waterproofing is invisible once the tile is on. These are the results of doing it properly.



Waterproofing is the easiest thing to cut, because once the tile is on nobody can tell. It is also the most common reason a bathroom needs redoing early. Ask to see the membrane before tile goes over it, and photograph every open wall before it is closed — in five years you will know exactly where the studs, blocking and pipes are.
Tile setting and waterproofing include curing periods that cannot be compressed. A bathroom that appears to be standing still for a few days usually is not.
| Phase | Typical duration |
|---|---|
| Design and selections | 4–8 weeks |
| On-site construction, full primary bath | 4–8 weeks |
| Powder room | 2–3 weeks on site |
| Frameless shower glass | 2–3 weeks after the tile is finished and measured |
Walk the room, establish whether the plumbing can move, and be honest about what that costs.
Fixture placement, clearances and every wall drawn — including where the sconces land.
Tile, stone, fittings, vanity, glass and lighting, chosen against each other rather than in isolation.
Waterproofing inspected before tile, curing respected, and the finish trades sequenced properly.
Jan designs the space and then runs the build. No hand-off, no two firms blaming each other, and nothing lost between the drawing and the crew.
Floor plans and elevations first, so you see the room before it exists. On paper, changing your mind is free. After the plumbing is run, it is not.
Chateau Concepts, LLC is registered as a general contractor with the City of Dallas, which requires registered contractors to carry general liability insurance. Certificates available on request.
4.9★ from 15 Google reviews. The person you meet at the consultation is the person on site at installation.
Layout, waterproofing and ventilation decide whether it lasts. Those come first.